Costs and decisions
Repair or replace concrete?
You have a problem and four possible answers, and every contractor sells a different one.
This is the question underneath almost every other question on this site. Repair, level, resurface or replace — four answers, very different costs, and a real chance of picking the wrong one because the contractor you called happens to specialise in it.
The useful way through it is not to compare the options against each other. It is to work out what is actually wrong, because each option assumes something different about the problem, and most of the time only one or two of those assumptions hold.
What each option assumes
Leveling assumes the concrete is sound and only its elevation is wrong. If that is true, it is usually the least disruptive answer. If it is not, lifting produces a damaged slab at a better height.
Localized repair assumes the problem is contained and the rest is fine. That holds when the cause was local — a trench, a downspout, a root. It does not hold when the same failure is starting in four other places.
Resurfacing assumes the structure is sound and only the surface has failed. It cannot correct movement, and it will reproduce a moving crack along the same line.
Replacement assumes the concrete itself is finished. It is the only option that lets you change thickness, reinforcement, slope or layout, and the only one that resets the base.
The three observations that decide it
First: has it moved, or has it deteriorated? Movement is a ground problem and points toward leveling or replacement. Deterioration is a concrete problem and points toward resurfacing or replacement. Both together usually means replacement.
Second: is the slab still one piece? Lifting requires a slab that moves as a unit. Concrete in several pieces cannot be lifted meaningfully and cannot be usefully resurfaced.
Third: is it still changing? A stable problem can be treated on its own terms. An active one means the cause is still running, and anything installed over it inherits the countdown.
- Moved, intact, cause fixable → leveling is worth pricing.
- Deteriorated on the surface, sound underneath, unmoved → resurfacing is worth pricing.
- Contained damage, stable, rest of the area fine → localized repair is worth pricing.
- Broken up, crumbling, widespread, or several of these at once → replacement is the realistic path.
- Still actively moving → find out why before choosing any of them.
The trap of the cheapest answer
The cheapest option is only the cheapest if it holds. Lifting a slab for a fraction of replacement is excellent value when the slab is sound and the cause has finished, and poor value when it needs replacing in two years anyway.
Conversely, replacement is not automatically the safe choice. Replacing sound concrete that has simply settled means paying for demolition, disposal and a new pour to solve a problem that lifting would have solved.
The question is not which is cheaper. It is which is true.
When to get more than one opinion
When a contractor who only does one thing recommends that thing, that is not dishonest, but it is not independent either. A leveling specialist looking at a marginal slab and a replacement contractor looking at the same slab will often reach different conclusions in good faith.
Where the job is large enough to matter, getting one quote from each discipline is worth the time. Ask each of them what would make them recommend the other approach — the answer tells you a great deal about how they think.
What to ask a contractor
- What do you think is actually causing this?
- What would make you recommend a different approach than the one you are proposing?
- If I do the cheaper option now, what is the realistic expectation before I am back here?
- Is there anything that needs fixing that is not concrete work?
Common questions
Can I trust a contractor who only offers one method?
Usually, yes — specialisation is normal and often means they are good at it. What you cannot get from them is a neutral comparison, because they can only sell you one side of it. Ask them directly what would make them tell you to do something else. A good one will have a clear answer.
How many quotes should I get?
For anything substantial, three is a reasonable norm, and it is more useful when they are not all from the same discipline. Two leveling quotes and one replacement quote tell you more than three leveling quotes.
Work it out, or judge the quote
Repair or replace tool
Ten questions about what you can see, and the options your answers rule out.
Open it →Project cost planner
Where your project sits relative to other residential concrete work, and what will actually move your quotes.
Open it →Freeze–thaw and soil risk guide
How water, freezing, soil movement and compaction damage slabs — and how to tell which one you have.
Open it →Related guides
Leveling vs replacement
When lifting is the smart economy and when it is a deposit on a job you will still do.
Read more →Resurfacing vs replacement
When a new surface is genuine value and when it is a cosmetic delay.
Read more →Common concrete problems
Start here: match what you are seeing to what it usually means and what it usually needs.
Read more →How to compare quotes
Make different-looking quotes comparable before you compare the totals.
Read more →Questions to ask a contractor
The questions that separate a diagnosis from a sales call — organised by what you are buying.
Read more →