Change Order Workspace

Slow the conversation down before you agree to a change

When the scope, price, material, schedule or site conditions change, ConcreteOwner helps you document what changed, what remains unclear, and which questions to resolve before you authorise the change.

Documentation and decision support. It is not legal advice, contract interpretation, an inspection, a payment system, or a ruling about who is responsible. Everything you enter stays in this browser.

Loading…

Why changes are hard, and why writing them down helps

Almost every concrete project changes somewhere. The ground is not what anybody expected, a material is unavailable, an area turns out to be bigger than it measured on a drive-past, or you look at the forms and decide you want the patio a foot wider. None of that means anything has gone wrong.

What makes changes difficult is that they are agreed standing on a driveway, in five minutes, between two people who are each certain afterwards that they said something slightly different. A month later there is no way to establish which. Two sentences written down at the time are worth more than any amount of recollection later.

What this workspace does

It gives you 17 kinds of change to choose from and 23 things that can matter when one comes up — what area is affected, what happens to drainage, who handles a permit, whether the rest of the original scope still stands, what would show the work was done as described. It shows you only the ones that apply, keeps track of which you have had answered, and gives you something to ask for each one you have not.

You can record several changes on one project, note where each one stands, and print the lot. Nothing is uploaded, no account is required, and no contact details are needed to create, save, review or print anything here.

What it will not do

  • It will not tell you whether a change is necessary, or whether a figure is reasonable. ConcreteOwner has no pricing data and takes no view on anybody’s number.
  • It will not tell you whether to pay, whether to hold anything back, or whether money is owed. What is due, when, and on what terms is set by your agreement and by the law where you live.
  • It will not establish that work was carried out, or carried out adequately. Recording that you were told something is finished is a note about a conversation, not a verification of a slab.
  • It will not decide who is right. There is nowhere here to record fault, and that is deliberate — a document that assigns blame is not one you can hand to the person you are still working with.
  • It will not rate, rank or score a contractor, and it produces no number of any kind about anybody’s conduct.

When to stop using a website and talk to somebody

If a change turns on what your contract actually requires, on whether a payment can be held, on a lien or a notice, or on whether something structural is adequate, that is the point where a qualified local professional is the answer. Contracts, payment rights, notice periods, money held back and dispute procedures all vary by jurisdiction and by agreement, and none of them is something a national website can read for your project.

That is not a warning about your contractor. Most changes on most jobs are ordinary, get explained in a two-minute conversation, and never need any of this. The workspace exists for the ones that do.